Industrial equipment configurator
Technical configuration of transfer couplings, industrial sight glasses, fluid meters and hose reels. Select equipment according to the application and installation requirements.

DDC couplings
Dry disconnect couplings with connections for hoses, tanks and liquid transfer pipework.
Configure DDC
DAC couplings
2½-inch dry aviation couplings for fuel transfer at tankers and refuelling vehicles.
Configure DAC
DGC couplings
Dry gas couplings for LPG, with tank and hose units and threaded or flanged connections.
Configure DGC
Sight glasses and MAXOS glass
Process and level sight glasses for vessels and pipework, including MAXOS safety glass.
Configure a sight glass
Fluid meters
Positive displacement volumetric meters and Coriolis metering systems for AdBlue.
Configure a meter
Hose reels
Industrial hose reels with manual, spring or powered rewind configurations.
Configure a hose reelFrom technical specification to quotation request
Equipment selection
Identify the equipment type and its intended industrial application.
Technical specification
Specify the dimensions, materials, connections and operating options available.
Quotation request
Review the specification, export the PDF summary and submit the details for technical and commercial assessment.
Configuration guidance
What distinguishes the MannTek DDC, DAC and DGC series?
DDC couplings cover liquid transfer applications; DAC couplings are intended for aviation fuel logistics; DGC couplings are designed for LPG. Selection should be based on the product and service conditions before specifying the equipment connections.
Is a manufacturer reference required to start the configuration?
Configuration can be prepared from the installation requirements and dimensions. For replacement equipment, the existing reference, technical documentation and photographs assist identification of the required version.
Does submitting the specification confirm an order?
Submission constitutes a quotation request to PECTA. The technical configuration, price, delivery period and supply conditions are established in the proposal.